6.1 GENERAL OVERVIEW
Network Change
There are four networks officially part of the LRTP “2040 Path Forward” effort. These are for the years 2010, 2018 (E+C), 2030 and 2040. Table 6.1 provides the user with information regarding the period of construction related to the planned roadway projects within the North Florida TPO’s area.
Table 6-1 Path Forward 2040 Cost Feasible Plan Project List
County | Map Id | Facility | From | To | Improvement Type | Construction Year Band |
---|---|---|---|---|---|---|
Clay | 1027 | CR 218 | Cosmos Avenue | Pine Tree Lane | Widen to 4 Lanes | 2021-2025 |
Clay | 33 | CR 220 Doctors Inlet Road | SR 21 Blanding Boulevard | Knight Boxx Road (end of four lane) | Widen to 4 Lanes | 2021-2025 |
Clay | 114 | SR 21 Blanding Boulevard | SR 16 | CR 215 Blanding Boulevard | Widen to 4 Lanes | 2021-2025 |
Clay | 41 | SR 23 First Coast Expressway | at CR 218 | New Interchange | 2021-2025 | |
Clay | 1012 | SR 23 First Coast Expressway | at CR 739 | New Interchange | 2021-2025 | |
Clay | 1013 | SR 23 First Coast Expressway | at SR 16 | New Interchange | 2021-2025 | |
Clay | 8202 | SR 23 First Coast Expressway | US 17 | SR 21 Blanding Boulevard | New 4 Lane Road | 2021-2025 |
Clay | 34 | CR 220 Doctors Inlet Road | College Drive | US 17 | Widen to 6 Lanes | 2026-2030 |
Clay | 106 | SR 16 | CR 218 | SR 15A Oakridge Avenue | Widen to 4 Lanes | 2026-2030 |
Clay | 908 | SR 16 | US 17 | Shands Bridge | Widen to 4 Lanes | 2026-2030 |
Clay | 13 | Cheswick Oak Avenue Extension | Oakleaf Plantation Parkway | Savannah Glen Boulevard | New 4 Lane Road | 2031-2040 |
Clay | 1026 | CR 218 | US 301 | Cosmos Avenue | Widen to 4 Lanes | 2031-2040 |
Clay/St. John's | 8203 | SR 23 First Coast Expressway | I-95 | US 17 | New 6 Lane Road | 2021-2025 |
County | Map Id | Facility | From | To | Improvement Type | Construction Year Band |
Duval | 1019 | 5th Street (McDuff Avenue Phase 3) | Melson Avenue | Huron Street | Widen to 3 Lanes | 2019-2020 |
Duval | 2 | Alta Drive | Faye Road | Burkit Lane | Widen to 5 Lanes | 2019-2020 |
Duval | 15 | Collins Road | SR 21 Blanding Boulevard | Pine Verde | Widen to 4 Lanes | 2019-2020 |
Duval | 930 | Collins Road | Shindler Drive | Rampart Road | Widen to 4 Lanes | 2019-2020 |
Duval | 932 | Collins Road | Old Middleburg Road S | Shindler Drive | Widen to 4 Lanes | 2019-2020 |
Duval | 37 | Eastport Road | SR 105 Heckscher Drive | Pulaski Road | Widen to 3 Lanes | 2019-2020 |
Duval | 1021 | Florida Boulevard | Penman Road | SR 10 Atlantic Boulevard | Widen to 3 Lanes | 2019-2020 |
Duval | 49 | Hartley Road | SR 13 San Jose Boulevard | Old St. Augustine Road | Widen to 3 Lanes | 2019-2020 |
Duval | 1022 | I-295 | I-95 South | SR 13 San Jose Boulevard (Buckman Bridge) | Add 2 Express Lanes | 2019-2020 |
Duval | 1023 | I-295 | SR 202 J. T. Butler Boulevard | SR 9B | Add 2 Express Lanes | 2019-2020 |
Duval | 73 | Kernan Boulevard | SR 202 J. T. Butler Boulevard | Glen Kernan Parkway | Widen to 6 Lanes | 2019-2020 |
Duval | 933 | Kernan Boulevard | SR 10 Atlantic Boulevard | McCormick Road | Widen to 6 Lanes | 2019-2020 |
Duval | 1015 | Old Middleburg Road | Argyle Forest Boulevard | SR 134 103rd Street | Widen to 4 Lanes | 2019-2020 |
Duval | 953 | Pulaski Road | Eastport Road | I-295 | Widen to 4 Lanes | 2019-2020 |
Duval | 935 | Ramona Boulevard (Crystal Springs Road Phase 2) | Hammond Boulevard | Cahoon Road | Widen to 5 Lanes | 2019-2020 |
Duval | 934 | Ricker Road | Morse Avenue | Old Middleburg Road | Widen to 3 Lanes | 2019-2020 |
Duval | 1009 | San Pablo Road | US 90 Beach Boulevard | SR 10 Atlantic Boulevard | Widen to 3 Lanes | 2019-2020 |
Duval | 101 | Shindler Drive | Collins Road | SR 134 103rd Street | Widen to 3 Lanes | 2019-2020 |
Duval | 960 | SR 115 Southside Boulevard | Gate Parkway | Hogan Road | Intersection Improvements | 2019-2020 |
Duval | 957A | SR 21 Blanding Boulevard | at Collins Road | Intersection Improvements | 2019-2020 | |
Duval | 957B | SR 21 Blanding Boulevard | at SR 134 103rd Street | Intersection Improvements | 2019-2020 | |
Duval | 957C | SR 21 Blanding Boulevard | at Cedar Hills Boulevard | Intersection Improvements | 2019-2020 | |
Duval | 701 | SR 243 JIA North Access Road | SR 102 Airport Road | Pecan Park Road | Widen to 4 Lanes | 2019-2020 |
Duval | 1024 | SR 9B | Phillips Highway (US 1) | I-295 | Add 2 Auxiliary Lanes | 2019-2020 |
Duval | 1016 | Cahoon Road | Lenox Avenue | US 90 Beaver Street | Reconstruct 2 Lanes | 2021-2025 |
Duval | 972 | Cecil Field Connector | Commerce Center | SR 23 First Coast Expressway | New 2 Lane Road | 2021-2025 |
Duval | 971 | Chaffee Road | SR 228 Normandy Boulevard | Crystal Springs Road | Widen to 5 Lanes | 2021-2025 |
Duval | 1020 | Clark Road Extension | Broward Road | Clark Road | New 3 Lane Road | 2021-2025 |
Duval | 121 | I-295 | SR 113 Southside Connector | SR 202 J. T. Butler Boulevard | Add 4 Express Lanes | 2021-2025 |
Duval | 964 | I-295 | at US 17 Roosevelt Boulevard to Wells Road | Modify Interchange | 2021-2025 | |
Duval | 68 | I-95 | at Airport Road (SR 102) - Phase 2 | Modify Interchange | 2021-2025 | |
Duval | 418A | I-95 | Duval/St. John's County Line | I-295 | Add 4 Express Lanes | 2021-2025 |
Duval | 714 | SR 10 Atlantic Boulevard | at Girvin Road | Intersection Improvements | 2021-2025 | |
Duval | 715 | SR 10 Atlantic Boulevard | at Hodges Boulevard | Intersection Improvements | 2021-2025 | |
Duval | 716 | SR 10 Atlantic Boulevard | at San Pablo Boulevard | Intersection Improvements | 2021-2025 | |
Duval | 968 | SR 115 Southside Boulevard | at SR 10 Atlantic Boulevard | Intersection Improvements | 2021-2025 | |
Duval | 9 | SR 21 Blanding Boulevard | I-295 | Wilson Boulevard | Widen to 6 Lanes | 2021-2025 |
Duval | 701 | SR 243 JIA North Access Road | SR 102 Airport Road | Pecan Park Road | Widen to 4 Lanes | 2021-2025 |
Duval | 959 | US 17 Main Street | at Eastport Road | New Interchange | 2021-2025 | |
Duval | 1017 | US 17 Main Street | New Berlin Road | Pecan Park Road | Widen to 4 Lanes | 2021-2025 |
Duval | 16 | US 17 Roosevelt Boulevard | at Collins Road | New Interchange | 2021-2025 | |
Duval | 7 | US 90 Beaver Street | Cahoon Road | McDuff Avenue | Widen to 4 Lanes | 2021-2025 |
Duval | 1 | Alta Drive Realignment | SR 105 Zoo Parkway | North of New Berlin Road (south) | New 4 Lane Road | 2026-2030 |
Duval | 406 | I-10 | US 301 | SR 23 First Coast Expressway | Add 4 Express Lanes | 2026-2030 |
Duval | 57 | I-295 | SR 13 San Jose Boulevard | W of US 17 Roosevelt Boulevard (Buckman Bridge) | Add 4 Express Lanes on Bridge | 2026-2030 |
Duval | 410 | I-295 | SR 134 103rd Street | I-10 | Add 4 Express Lanes | 2026-2030 |
Duval | 419 | I-95 | at US 1/SR 15 MLK | Modify Interchange | 2026-2030 | |
Duval | 962 | I-95 | at SR 115 Southside Boulevard | Modify Interchange | 2026-2030 | |
Duval | 1034 | New World Avenue | SR 23 First Coast Expressway | Chaffee Road | New 2 Lane Road | 2026-2030 |
Duval | 940 | SR 104 Dunn Avenue | US 1 SR 15 New Kings Road | I-295 | Widen to 4 Lanes | 2026-2030 |
Duval | 941 | SR 104 Dunn Avenue | Old Kings Road | US 23 New Kings Road | Intersection Improvements | 2026-2030 |
Duval | 102 | SR 115 Southside Boulevard | US 1/SR 5 Philips Highway | I-95 Ramps | Widen to 6 Lanes* | 2026-2030 |
Duval | 955 | Trout River Boulevard | Old Kings Road | US 23 New Kings Road | Widen to 4 Lanes | 2026-2030 |
Duval | 2 | Alta Drive / Yellow Bluff Road | I-295 | New Berlin Road (north) | Widen to 4 Lanes | 2031-2040 |
Duval | 432 | I-10 | I-295 | I-95 | Add 4 Express Lanes | 2031-2040 |
Duval | 454 | I-10 | at I-295 | Modify Interchange | 2031-2040 | |
Duval | 403 | I-10 | Nassau/Duval County Line | US 301 | Add 4 Express Lanes | 2031-2040 |
Duval | 407 | I-295 | I-95 North Interchange | Dames Point Bridge/ SR 105 Heckscher Drive | Add 4 Express Lanes | 2031-2040 |
Duval | 408 | I-295 | North of Trout River | I-95 North Interchange | Add 4 Express Lanes | 2031-2040 |
Duval | 409 | I-295 | South of US 1 New Kings Road | North of Trout River | Add 4 Express Lanes | 2031-2040 |
Duval | 411 | I-295 | I-10 | South of US 1 New Kings Road | Add 4 Express Lanes | 2031-2040 |
Duval | 431 | I-295 | US 17 Roosevelt Boulevard | SR 134 103rd Street | Add 4 Express Lanes | 2031-2040 |
Duval | 433 | I-95 | SR 202 J. T. Butler Boulevard | SR 10 Atlantic Boulevard | Add 4 Express Lanes | 2031-2040 |
Duval | 434 | I-95 | I-295 | SR 202 J. T. Butler Boulevard | Add 4 Express Lanes | 2031-2040 |
Duval | 1033 | National Cemetery Road | Lannie Road | Arnold Road | New 2 Lane Road | 2031-2040 |
Duval | 948 | New Berlin Road | Pulaski Road | Yellow Bluff Road | Widen to 4 Lanes | 2031-2040 |
Duval | 949 | New Berlin Road | Yellow Bluff Road | Cedar Point Road | Widen to 4 Lanes | 2031-2040 |
Duval | 103 | SR 115 Southside Boulevard | SR 202 J. T. Butler Boulevard | US 90 Beach Boulevard | Widen to 6 Lanes | 2031-2040 |
Duval | 966 | SR 115 Southside Boulevard | at SR 202 J. T. Butler Boulevard | Modify Interchange | 2031-2040 | |
Duval | 151 | SR A1A | SR 116 Wonderwood Drive | Naval Station Mayport North Gate | Widen to 4 Lanes | 2031-2040 |
Duval | 94 | US 1 SR 5 Philips Highway | SR 9B | I-295 | Widen to 6 Lanes | 2031-2040 |
Duval | 95 | US 1 SR 5 Philips Highway | I-95 at the Avenues | SR 202 J. T. Butler Boulevard | Widen to 6 Lanes | 2031-2040 |
County | Map Id | Facility | From | To | Improvement Type | Construction Year Band |
Nassau | 708 | US 301 SR 200 | US 1 S Kings Road | Intersection Improvements | 2019-2020 | |
Nassau | 708 | US 301 SR 200 | US 1 S Kings Road | Intersection Improvements | 2021-2025 | |
Nassau | 703 | SR 200 SR A1A | Amelia Island Parkway | Sadler Road | Widen to 6 Lanes | 2026-2030 |
Nassau | 707 | US 17 | Nassau/Duval County Line | Harts Road | Intersection Improvements | 2026-2030 |
Nassau | 704 | Amelia Island Parkway | South 14th Street | CR 105A Buccaneer Trail | Widen to 4 Lanes* | 2031-2040 |
Nassau | 501 | Concourse Loop Road | License Road | Amelia Concourse | New 2 Lane Road | 2031-2040 |
Nassau | 705 | CR 105A Buccaneer Trail | South Fletcher Avenue | Canopy Drive | Turn Lane Improvements* | 2031-2040 |
Nassau | 402 | I-10 | Baker/Nassau County Line | Nassau/Duval County Line | Add 4 Express Lanes | 2031-2040 |
Nassau | 981 | SR 200 | I-95 | Fernandina | Intersection Improvements | 2031-2040 |
Nassau | 706 | SR A1A | South Fletcher Avenue | Amelia Island Parkway | Turn Lane Improvements | 2031-2040 |
Nassau | 427 | SR A1A SR 200 | at US 17 | Intersection Improvements | 2031-2040 | |
Nassau | 708 | US 301 SR 200 | US 1 S Kings Road | Intersection Improvements | 2031-2040 | |
County | Map Id | Facility | From | To | Improvement Type | Construction Year Band |
St. Johns | 810 | CR 2209 | SR 23 First Coast Expressway | CR 210 | New 6 Lane Road | 2019-2020 |
St. Johns | 1025 | Dixie Highway / Pellicer Lane | CR 214 King Street | SR 207 | Reconstruct 2 Lanes and Widen to add Sidewalks and Bike Lanes | 2019-2020 |
St. Johns | 835 | SR 16 | International Golf Parkway | South Francis Road | Widen to 4 Lanes | 2019-2020 |
St. Johns | 831 | SR 313 | SR 207 | SR 16 | New 6 Lane Road | 2019-2020 |
St. Johns | 1008 | SR A1A | at Red Cox/Coquina Rd | Intersection Improvements | 2019-2020 | |
St. Johns | 811 | CR 2209 | SR 16 Connector | SR 23 First Coast Expressway | New 6 Lane Road | 2021-2025 |
St. Johns | 818 | CR 305 | CR 204 | SR 206 | New 2 Lane Road | 2021-2025 |
St. Johns | 418B | I-95 | International Golf Parkway | St. John's/Duval County Line | Add 4 Express Lanes | 2021-2025 |
St. Johns | 828 | Race Track Road | Bartram Park Boulevard | Bartram Springs | Widen to 4 Lanes | 2021-2025 |
St. Johns | 840 | SR 23 First Coast Expressway | at I-95 | New Interchange | 2021-2025 | |
St. Johns | 841 | SR 23 First Coast Expressway | at CR 16 A | New Interchange | 2021-2025 | |
St. Johns | 847 | SR 23 First Coast Expressway | at CR 2209 | New Interchange | 2021-2025 | |
St. Johns | 845 | US 1 SR 5 Philips Highway | at CR 210 | Modify Interchange | 2021-2025 | |
St. Johns | 812 | CR 2209 | International Golf Parkway | SR 16 Connector | New 6 Lane Road | 2026-2030 |
St. Johns | 816 | CR 2209 | CR 208 | SR 16 | New 4 Lane Road | 2026-2030 |
St. Johns | 832 | SR 313 | SR 16 | US 1 Dixie Highway | New 4 Lane Road | 2026-2030 |
St. Johns | 800 | SR A1A | Mickler Road | Palm Valley Road | Widen to 4 Lanes | 2026-2030 |
St. Johns | 813 | CR 2209 | CR 214 | CR 208 | New 4 Lane Road | 2031-2040 |
St. Johns | 815 | CR 2209 | SR 16 | International Golf Parkway | New 4 Lane Road | 2031-2040 |
St. Johns | 827 | Race Track Road | St. Johns Parkway | Bartram Park Boulevard | Widen to 4 Lanes | 2031-2040 |
St. Johns | 827 | Race Track Road | St. Johns Parkway | Bartram Park Boulevard | Widen to 4 Lanes | 2031-2040 |
St. Johns | 113 | SR 207 | I-95 | South Holmes Boulevard | Widen to 6 Lanes | 2031-2040 |
St. Johns | 115 | SR 312 | US 1/SR 5 Dixie Highway | SR A1A | Widen to 6 Lanes | 2031-2040 |
2019-2020 | ||||||
2021-2025 | ||||||
2026-2030 | ||||||
2031-2040 |
Employment Change
In future, some areas may see growth/decline in employment due to increase/decrease in business establishments or some other reasons. In addition, the distribution of different employment types could change over the years.
In order to reflect those changes in the model DaySim buffered parcel file needs to be updated - \Master\{SCENARIO_DIR}\ Input\DaySimInput\02_Parcel\ Jacksonville_parcel_decayandCirc.dat.
To update the file, two steps should be performed:
- If employment at a TAZ is same, including in different sectors, but distribution of employment in parcels within the TAZ have changed then either of the two should be undertaken:
- Edit the parcel file manually.
- Get new block level controls (with employment in 2-digit NAICS categories) and run the allocation tool (see section 5.1 |) to obtain an updated parcel file.
- If employment (or/and distribution of employment sectors) at a TAZ is different, the new TAZ file should be used to run the allocation tool (see section 5.1 |). The tool will produce an updated parcel file.
- The first step would create a new parcel file and an updated TAZ file, if necessary. The new parcel file should be provided as input to the buffering too (see section 5.1 | ) and generate a new buffered parcel file. This file should then be replaced in the DaySimInput folder.
Population Change
After a base year population has been synthesized, new synthetic populations may need to be generated based on the type scenario being run or the policy being tested. For example, a change in the network may not require the population to be synthesized again. On the other hand, if a land-use policy variable is being tested which would result in significantly different patterns in the population and employment levels in the TAZs than in the base case, a new synthetic population would be have to be generated. The same would be the case for a future year run when the population mix or distribution of specific population characteristics may deviate from those in the base synthetic population. Population is likely to increase in future, however, it may not increase proportionately geographically. A change in employment may also alter the existing geographic distribution of the population. To accommodate a change in population following three input files need to be updated:
- Buffered parcel file (\Master\{SCENARIO_DIR}\Input\DaySimInput\02_Parcel\ Jacksonville_parcel_decayandCirc.dat)
- Household file (\Master\{SCENARIO_DIR}\Input\DaySimInput\03_Household\_jax_hrec.dat)
- Person file (\Master\{SCENARIO_DIR}\Input\DaySimInput\04_Person\_jax_prec.dat)
To update the buffered parcel file, the similar steps as employment change accommodation needs to be performed. First, the parcel file (output of the allocation tool) is updated and then it is used in the buffering tool to generate a new buffered parcel file that goes into DaySim.
Synthetic population data (household and person files) would also need updates. As previously described, the synthetic population is generated using PopGen. The marginal control files for population synthesis need to be updated to reflect the new control totals. After that synthetic population needs to be generated using the new input files (Please refer to PopGen guide for synthesis instructions).