NERPM activity based model integrates DaySim within Cube environment. The following figure shows a screenshot of the Cube interface that is used to run and maintain the model.

FIGURE 5-

...

27 NERPM-AB CUBE INTERFACE

There are two ways of running the whole model:

...

  • “Alternative Letter” (One digital letter such as A, B, C, etc)
  • “Alternative Year” (Two digial number such as 10, 15, 20, etc)
  • “Alternative Year Directory”, where Input and Output folders located
  • “ClusterNodes”, which could be equal or less than number of processors. Set this equal to number of processors to fully utilize computation power
  • If a scenario involved different park and ride or kiss and ride lots than base year (see \Master\{SCENARIO_DIR}\Input\DaySimInput\05_pnr\jax_p_rNodes.dat), user should create new Park and ride file and update key “ParkAndRide”
  • If a scenario is future scenario or involved different land use than base year, user should create new DaySim inputs and update following keys
    • ParcelFile
    • HouseholdFile
    • PersonFile

FIGURE 5-

...

28 MODEL RUN INTERFACE

 

FIGURE 5-

...

29 CUBE SCENARIO EDITOR