The model currently runs AM and PM assignments in sequence; however, it will be able to run them in parallel with minor changes in the model. In this case, the model should know which computer logical processor is the first one used for AM assignment (also which one is the first one for PM period). The interface has these two keys now and, since they are not run in parallel, the value for them should be higher than number of computer logical processors. The default value, therefore, was set to 25, which is suitable for any machine with up to 24 logical processors.

Figure 7-1: Assigning computer cores to computer logical processors to highway assignments by time period

...

If the user wants to save the congested path files, they can choose the option to save the path file for a particular period. The paths are saved in an extra highway assignment run at the end of the model based on the final congested network. It should be noted that Cube Cluster does not support the use of multiple cores for multiple logical processors for path saving; therefore, this step takes a bit longer than would a normal assignment that can be distributed across processors.

...